In-Progress

Here are a few of the projects we’re currently working on.

Tauranga Boys College

Tauranga Boys College is a 2 stage project: Stage 1 includes a 600m3+ underground cirtex rainsmart stormwater attenuation system, also an extension to the existing carpark area by approx. 2080m2 which provides an additional 90 carparks. Stage 2 is to demolish an existing carpark area to make way for the new 2 storey building which provides an additional 12 teaching spaces. The exterior is made up of multiple claddings including coloursteel, Brickwork and multiple James Hardie claddings. The architecturally designed interior spaces include plasterboard, Autex, Laminex strandboard & decortech linings. Stage 2 also includes approx. 2500m2 of landscaping made up of permeable paving, tigerturf, multiple concrete finishes and planted areas.

Waihi Beach Switchroom

Project for Powerco to increase the existing Substations Power Capacity servicing Waihi Beach (Located on Waihi Beach Rd) and allowing for further expansion to these areas. The Works entail Specifically designed 2 level Concrete Buildings housing New Switchgear, New Transformer Foundations and Concrete Slabs, Civil and Siteworks with Asphalt and Metalled Yard Areas, Security and Stock Fencing and the Demolition of the existing Switchgear Buildings.

Waihi 33kv Switchroom

Project for Powerco are to increase the existing Substations Power Capacity servicing Waihi (Located on SH2) and allowing for further expansion to these areas. The Works entail Specifically designed 2 level Concrete Buildings housing New Switchgear, New Transformer Foundations and Concrete Slabs, Civil and Siteworks with Asphalt and Metalled Yard Areas, Security and Stock Fencing and the Demolition of the existing Switchgear Buildings.

Tauranga Baptist Church

This project is the Baptist Church on the corner of Cameron Rd & 14th Ave. The Church was rebuilt in 1967 after the original Church that was built in 1911 was moved to the historic Village. The upgrade includes painting & carpet to the Auditorium, Hall & Chapel. Demolition of the existing concrete stage & mezzanine floor to make way for a new commercial kitchen & modern toilet facilities. The upgrade includes bring the building up to code with Fire Protection & Accessibilities by installing a new lift. Start Date is End of Jan & completed by July 2022.

Retail Development - Pareone KoiKoi Road

This is a 1900m2 Retail Development with 4 Tenancies located in Tauriko Tauranga. The Building consists of 150mm Concrete Floors, Exterior Precast Panels, Al Joinery Shopfronts with Longrun Roofing. The Facade of the building is Architecturally Featured with Abodo Timber Screens and Danpalon Polycarbonate Cladding. Civil Works include 40 Carparks and retained at the Boundary by Stone Gabion Cages.

Apanui School

Apanui School is located in Whakatane, and recently lost a Learning and Admin Block in a fire. This project replaces what was lost and is a fast track project working closing with the MOE’s Team. Project scope is Construction of an 8 teaching space learning block (850m2), with and Admin block (330m2) and associated siteworks, due for completion early 2023.

Body in Motion

This is a 3-level office building with multiple tenancies with approximately 1000m2 of office space available. Currently Body In Motion will take up the ground floor space and part of second floor . Construction is of structural steel and suspended concrete floor slabs with insitu concrete walls and block work shear walls. Cladding is a mixture of exterior plaster system of AC panel and Nuwall aluminium cladding. Completion is due mid 2022.

Tokoroa Trades Training Centre

This is a Design & Build project for a new tertiary education facility in Tokoroa. This project includes construction of the 3,300m2 tertiary education facility comprising two levels of administration, workshops, teaching, digital hub, commercial kitchen, staff and social areas and circulation. Works commence on site early 2022 with completion being early 2023.

19 Devonport Road

Stage 1 of this project is a seismic upgrade of an existing building that once was the premises of Whitcoulls. The Davies Building was built in 1930s. The front façade and canopy will be removed and replaced with new structural steel and a new modern looking architectural design shop front. Stage 2 will include removing the back of the building and construction of a new 2-storey carpark that will service the new tenants. The structure will be formed using in situ concrete, unispan precast concrete, blockwork and structural steel. The last part of the construction is a full fitout of the upstairs office space including a reroof and new deck.

Tawa Street Apartments

This is a Town house Development which incorporates 5 adjoining townhouses. Each unit is approximately 160m2 in size over two levels. Construction is block walls with suspended concrete slab and lightweight timber walls and trusses to top floor, with plaster over cavity and aluminium weatherboard for the cladding, finished to medium specifications internally. Due for completion September 2022

Quest Apartments Mt Maunganui

Mount Maunganui is soon to have a three story apartment style hotel which includes 30 studio, eight one-bedroom and two two-bedroom units. This apartment complex also promises four ground floor retail tenancies and 27 carpark spaces.


Completed

These are just a few of the many amazing projects we've recently completed.
Bear with us as we will adding more projects here soon!