Commercial & Retail
The Lakes Shopping Village was a design and build completed by Marra over an eight month period. Marra was involved in the fit outs of the shopping village, including Maude Café.
![](https://www.marraconstruction.co.nz/wp-content/uploads/2020/10/Lot-949-3-3.jpg)
![](https://www.marraconstruction.co.nz/wp-content/uploads/2020/10/Lot-949-4-3.jpg)
Commercial & Retail
The Lakes Shopping Village was a design and build completed by Marra over an eight month period. Marra was involved in the fit outs of the shopping village, including Maude Café.